El Monte Gateway Transit Oriented Development

7 Documents in Project

Summary

SCH Number
2005121046
Lead Agency
City of El Monte
Document Title
El Monte Gateway Transit Oriented Development
Document Type
NOD - Notice of Determination
Received
Posted
1/15/2014
Present Land Use
Commercial, mass transit, park and ride, public works facility, water production and parks
Document Description
The Project is implementation of a Removal Action Work plan (RAW) for the construction of a cap for the mitigation of lead-impacted soil and completion of a removal action of undocumented fill beneath portions of the proposed development associated with the presence of a former "burn dump" at 3527 Santa Ana Avenue, El Monte, California (site). The draft RAW recommends installation, operation, and maintenance of a Geosynthetic Clay Layer (GCL)), to be installed at the ground surface as a means to prevent direct contact with the lead impacted soil. Furthermore, an Operations and Maintenance plan will be developed to ensure the integrity of the cap in perpetuity. Finally, the land owner will record a Land Use Covenant, ensure future land use is consistent with the proposed development and DTSC is to be notified of any changes to future land use.

Contact Information

Name
Richard D. Allen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
El Monte
Counties
Los Angeles
Cross Streets
Santa Anita and Valley Boulevard
Total Acres
65
State Highways
Interstate 10
Railways
UPRR, Metrolink
Airports
El Monte Airport
Waterways
Rio Hondo Channel

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes