Removal Action Workplan, Proposed King City Middle School, King City Union School District
Summary
SCH Number
2005118020
Public Agency
Department of Toxic Substances Control
Document Title
Removal Action Workplan, Proposed King City Middle School, King City Union School District
Document Type
NOE - Notice of Exemption
Received
Posted
11/2/2005
Document Description
The Removal Action Workplan (RAW) for the proposed King City Middle School (Site) addresses on-site management and control of soils impacted with naturally occurring asbestos (NOA). Various types of engineering controls will be used to separate the NOA contaminated soils from students, staff, administrators, and maintenance personnel. Among these is importing approximately 20,000 cubic yards of clean-cover soil. An Operations and Maintenance (O&M) Plan will protect the health of students, staff, administrators, maintenance personnel, and visitors to the campus and provides for upkeep, monitoring, and reporting on NOA engineering controls at the campus. No student, faculty, staff, or unauthorized persons will be on the Site during the proposed remedial actions that will occur during construction of the school. Off-site disposal of NOA containing soil is not planned. The soil generated during grading and construction will be contained on site.
Contact Information
Name
Mark Malinowski
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
King City
Counties
Monterey
Notice of Exemption
Exempt Status
Other
Type, Section or Code
Section 15061(b)(3)
Reasons for Exemption
1. This removal action will not have the potential for significant effects on the environment because of the control measures associated with excavation, grading, and on-site disposal of the NOA impacted soils. All areas where earthmoving will occur will be watered down prior to and during these activities to suppress dust. The air pollution control district requirements will be met for monitoring and/or controlling fugitive dust during site grading and construction.
2. The Asbestos Mitigation and Air Monitoring Plan, and a Health and Safety Plan, both a part of the RAW, will eliminate exposure of construction workers and nearby residences to dust and naturally occurring asbestos from the school site during the RAW construction activities. The RAW includes an O&M Plan, for management of the NOA soils that will be protected or covered, after construction is completed.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.