Perris II Desalter
12 Documents in Project
Summary
SCH Number
2005114006
Lead Agency
Eastern Municipal Water District
Document Title
Perris II Desalter
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2015
Present Land Use
vacant / 2.5-1R / 2.5-1R
Document Description
Eastern Municipal Water District (EMWD) proposes to construct and operate the Perris II Brackish Groundwater Desalter and Ancillary Facilities Project (Project). The proposed Project would involve the construction of the desalter itself along with supporting infrastructure. Supporting infrastructure may include up to three new wells and associated equipment; approximately 74,000 linear feet of pipeline measuring up to 36-inch diameter; pumping facilities; wellhead treatment and monitoring; and other equipment or facilities as determined by final design.
It is anticipated that the proposed Project would provide up to 6.3 mgd of water pumped from twelve existing and up to seven new brackish water wells feeding into a reverse osmosis desalination plant. Four of the new wells are either under construction or anticipated to be under construction in 2015. The proposed Project would meet the potable water demands for up to 12,000 homes in the disadvantaged community areas of the cities of Perris and Menifee as well as a portion of unincorporated Riverside County, California.
The Project proposes to relocate the previously approved Perris II Desalter Project to a site located adjacent to Murrieta Road just north of the extension of Valley Boulevard in the City of Menifee. This site is immediately east of EMWD's inactive Sun City Regional Water Reclamation Facility and active Menifee and Perris I Desalters site.
Contact Information
Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Menifee, Perris
Counties
Riverside
Cross Streets
Murrieta Road and Valley Boulevard
Zip
92586
Total Acres
8.79
Parcel #
339-200-078
State Highways
Hwy 215
Waterways
Salt Creek
Township
5S
Range
3W
Section
32
Base
SBB&M
Notice of Determination
Approving Agency
Easter Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.