Amendment to Approval Plans No. 06-05 (PPD No. 05-09) (Thermal Energy Storage TES Tank)

3 Documents in Project

Summary

SCH Number
2005111025
Lead Agency
City of Loma Linda
Document Title
Amendment to Approval Plans No. 06-05 (PPD No. 05-09) (Thermal Energy Storage TES Tank)
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2006
Present Land Use
Institutional Z: Institutional GP: Institutional
Document Description
The project is a request to redesign the Thermal Energy Storage (TES) tank in size and dimension from the approved 90 feet in height by 90 feet in diameter to 67 feet in height by 136 feet in diameter located at northeast corner property of Stewart Street and Anderson Avenue. The modification is required per OSHPD requirements for safety and university's long-term maintenance concerns such as the potential for rust, cracks due to earth shifts, ground vibrations from adjacent rail line movements, and general maintenance of the subterranean section of the tank. Additionally, the increase in capacity will provide chilled water throughout the university facilities and reduce in energy consumption. The proposal meets the intent of the original scope of the project and all mitigation measures will apply and help to minimize any potential impacts. The proposal site is the most appropriate location for institutional use including increased height and width by adding additional landscaping and muted tank color to minimize visual impact.

Contact Information

Name
H. P. Kang
Agency Name
City of Loma Linda
Contact Types
Lead/Public Agency

Location

Cities
Loma Linda, San Bernardino
Counties
San Bernardino
Cross Streets
Anderson Avenue
Zip
92354
Total Acres
~ 18
Parcel #
0283-071-31, 35, 43
State Highways
10
Railways
Pacific RR
Schools
Loma Linda Academy

Notice of Determination

Approving Agency
City of Loma Linda
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print