Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation

2 Documents in Project

Summary

SCH Number
2005091092
Lead Agency
Coachella Valley Water District
Document Title
Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2006
Present Land Use
Colonia; Rural Residential GP: Rural Residential
Document Description
The Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation project consists of the following: - Demolition of existing lift station (including pumps, motors, pipes, appurtenances); - Site improvements (grading, fencing); - Submersible-type pump station (2 pumps, motors, pipes, appurtenances); - 8-foot diameter wet well; - 8 feet high by 480 feet long concrete block wall enclosure; - Emergency generator; - Electrical, instrumentation and control panels; - Metal canopy with structural steel supports; - Approximately 80 feet of 12-inch VCP pipe and 1 manhole; - Approximately 310 feet of 6-inch PVC pipe; - Rehabilitation of approximately 250 feet of 8-inch sewer line; - Renovation of 9 manholes; and - Test, start-up and training for the new lift station facility. Construction of the Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation project is to take about 270 construction days; the targeted completion date is October 2006.

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Cross Streets
Avenue F / Fifth Street
Zip
92257
Total Acres
0.60
State Highways
SR-111
Railways
UPRR
Waterways
Salton Sea
Township
7S
Range
8E
Section
2
Base
SB
Other Location Info
Bombay Beach

Notice of Determination

Approving Agency
Board of Directors of the Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A