Verizon Wireless Use Permit

Summary

SCH Number
2005088548
Public Agency
Sacramento County
Document Title
Verizon Wireless Use Permit
Document Type
NOE - Notice of Exemption
Received
Posted
8/29/2005
Document Description
The proposed project consists of a Use Permit to allow a collocation wireless facility in the AR-2 zone. The proposal includes the installation of three additional antennas to be located at the 165-foot elevation, the same height of the existing antennas for Verizon Wireless, on the existing 218-foot high PG&E lattice tower. There are no changes or modifications proposed for the ground equipment. The Use Permit includes a deviation from the maximum 55-foot tower height, pursuant to Section 301-13.5 (d) (3) (cc) of the Sacramento County Zoning Code for a facility in a Group I zone.

Contact Information

Name
Joyce Horizumi
Agency Name
Sacramento County Dept. of Environmental Review
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Other Location Info
Community: Natomas

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301
Reasons for Exemption
The project consists of the minor addition to an existing structure (placement of antenna arrays on an existing PG&E transmission tower) involving negligible or no expansion of use beyond that previously existing and is therefore exempt from the provisions of CEQA.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print