Former Gibson Environmental Facility, Port of Redwood City

3 Documents in Project

Summary

SCH Number
2005082065
Lead Agency
Port of Redwood City
Document Title
Former Gibson Environmental Facility, Port of Redwood City
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2005
Present Land Use
Abandoned Property; Commercial / General Industrial; Port Priority Use
Document Description
The Port intends to complete closure and remediation activities at the former Gibson Environmental, Inc. facility Site. The 8.9-acre Site was a former liquid bulk terminal that was active between 1963 and 1995 and consists of ten aboveground bulk storage tanks, associated pipelines and ancillary equipment and structures and truck loading facilities. Petroleum- and metal-bearing wastes from facility operations have contaminated the shallow soil and shallow groundwater. CEQA Initial Study and Negative Declaration address the activities identified in the Site Closure Plan and the Corrective Measures Study/Remedial Action Plan (CMS/RAP). The Closure Plan activities generally include the removal of the facility tanks, equipment and structures, and the confirmation sampling beneath the Site Regulated Units. The CMS/RAP addresses soil and groundwater remediation, and closure of the Solid Waste Management Units and one Area of Concern. The petroleum-related contaminants in shallow soil and groundwater include predominantly jet fuel, gasoline and diesel, some of which are present as free-phase and residual product.

Contact Information

Name
Don Snaman
Agency Name
Port of Redwood City
Contact Types
Lead/Public Agency

Location

Cities
Redwood City
Counties
San Mateo
Cross Streets
Seaport Court, Beeger Road
Zip
94063
Parcel #
054-300-530
State Highways
84, 92, US101
Railways
Union Pacific
Schools
Fair Oaks, Orlon, Taft Elem, Redwood HS
Waterways
Redwood Creek
Township
5S
Range
3W
Base
MDB&M

Notice of Determination

Approving Agency
Port of Redwood City
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print