Alcatraz Creek Erosion Control Project

3 Documents in Project

Summary

SCH Number
2005081166
Lead Agency
Santa Barbara County
Document Title
Alcatraz Creek Erosion Control Project
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2005
Present Land Use
Z: M-CD (Coastal-Dependent Industry) Comprehensive Plan Designation: Industrial, Coastal Dependent Industry
Document Description
The Operator proposes to alter the streambed to repair erosion damage to the mouth of Alcatraz Creek to protect the Gaviota Terminal, an Arguello petroleum facility. The forebay facility, which includes electrical equipment, piping and pumps for salt water intake to the desalination plant, is in danger of being undermined and sea water may enter the underground storage area. The area is also an archaeological site. Rock rip-rap will be placed along the banks with large rock at the toe of the bank. The eroded areas of the creek will be filled with soil compacted to 90% under the rock rip-rap. Cultural deposits will be covered with a geo-fabric prior to the fill. A temporary concrete apron will be poured between the rock rip-rap and the culvert road crossing. The crossing will be replaced with the addition of a metal culvert, replacing an old brick culvert. The portion of intact brick culvert will be sealed with concrete, and the broken pieces shall be removed. Rock which was used for a temporary repair will be collected and used to protect the area which is in the surf/tide line.

Contact Information

Name
Natasha Lohmus
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Hwy. 101 and Calle Mariposa Reina
Total Acres
42.44
Parcel #
081-130-019 and 081-130-060
State Highways
US 101
Railways
Southern Pacific
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes