Well 26A Disposable Resin Ion Exchange System for Uranium Removal Project
3 Documents in Project
Summary
SCH Number
2005081131
Lead Agency
Mission Springs Water District
Document Title
Well 26A Disposable Resin Ion Exchange System for Uranium Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2005
Present Land Use
Existing water well site.
Document Description
The proposed project is the operation of the Well 26A Resin Ion Exchange system. The well and resin ion exchange unit have already been installed at the project site. Thus, it is the groundwater extraction, treatment to remove uranium, and delivery of the treated water to the District's potable water distribution system that constitutes the proposed project. Water from Well 26A will be pumped through the onsite resin ion exchange unit where the uranium will bind with the resin, thereby allowing the water leaving the unit to meet the California Department of Health Services Drinking Water standards. The treated water will be pumped into the District's water distribution system for potable water use. When the resin approaches its removal capacity, the resin will be removed and replaced with fresh resin. The contaminated resin will then be properly disposed of.
Contact Information
Name
Gary Brockman
Agency Name
Mission Springs Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Desert Hot Springs
Counties
Riverside
Cross Streets
San Pierre Road and Desert View Avenue
Total Acres
~ 1
State Highways
I-10
Township
3S
Range
3E
Section
8
Base
SBM
Notice of Determination
Approving Agency
Mission Springs Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.