Olive Hill; GPA 03-01, TM 4976RPL^5, R03-013, Log No. 91-02-032A
3 Documents in Project
Summary
SCH Number
2005081064
Lead Agency
San Diego County
Document Title
Olive Hill; GPA 03-01, TM 4976RPL^5, R03-013, Log No. 91-02-032A
Document Type
NOD - Notice of Determination
Received
Posted
7/19/2007
Present Land Use
The site is located within an Estate Development Area with a General Plan designation (17) Estate and zoned Rural Residential (RR0.5).
Document Description
Project activity includes altering the streambed of Bonsall Creek, tributary to the San Luis Rey River, to accommodate the Olive Hill Development Project. Construction activity includes grading and fill for the installation of the Rancho Del Caballo Bridge, impacting 0.53 acre of streambed. The bridge will be approximately 100 feet long with a width of approximately 31.5 feet, positioned approximately 24 feet above the existing streambed. The superstructure will consist of pre-cast concrete girders with a cast-in-place concrete deck. The superstructure will be supported on each end on conventional seat type abutments and concrete footings with two rows of driven piles. Rip-rap will be used to line the banks and protect the bridge abutments but rip-rap will not be placed in the drainage channel. A temporary crossing will be required immediately west of the bridge during construction, and will be placed within the grading footprint of the bridge. (Streambed alteration Agreement #1600-2004-0450-R5).
Contact Information
Name
Tamara Spear
Agency Name
Department of Fish and Game, South Coast Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Cross Streets
Olive Hill Road and SR 76
Total Acres
46
Parcel #
126-310-03-00; 126-050-54-00
State Highways
SR 76
Waterways
San Luis Rey River and Bonsall Creek
Township
10S
Section
19
Base
SBM
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.