Atwood Channel Reconstruction Project

2 Documents in Project

Summary

SCH Number
2005081016
Lead Agency
Orange County
Document Title
Atwood Channel Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2005
Present Land Use
Flood Control / Recreation / Recreation
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0542-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, County of Orange, Resources and Development Management Department. The operator proposes to alter the streambed and banks of Atwood channel by removing the existing damaged concrete lined channel and construction of an underground 10-foot by 7.5-foot reinforced concrete box culvert (RCB) within a 330-linear foot segment of Atwood Channel; the RCB would be constructed between two existing culverts. The construction staging area will be located on Orchard Drive within a portion of the paved cul-de-sac.

Contact Information

Name
Naeem Siddiqui
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Yorba Linda
Counties
Orange
Cross Streets
Kellogg Drive / Mountain View Avenue
Zip
92885
Total Acres
~ 0.2
State Highways
91
Schools
Fairmont ES
Waterways
Atwood Channel and Santa Ana River
Township
3S
Range
9W
Section
Unsect
Base
YorbaLin

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print