Kline Ranch Warehouse/Distribution Facility
3 Documents in Project
Summary
SCH Number
2005071054
Lead Agency
City of Rialto
Document Title
Kline Ranch Warehouse/Distribution Facility
Document Type
NOD - Notice of Determination
Received
Posted
9/7/2006
Present Land Use
The site consists of a portion of property known as the Kline Ranch, most recent used as a horse ranch. The site contains a single-family residential structure, four stable and barn structures, a horse track, and corrals. The General Plan designates the site as General Industrial. The site is zoned Heavy Industrial and Open Space/Equestrian/Agricultural.
Document Description
The Kline Ranch Warehouse Facility is a warehouse/distribution facility consisting of two buildings totaling 1,396,495 square feet. Building A will cover an area of approximately 796,841 square feet, which will consist of approximately 16,000 square feet of office space and 780,841 square feet of warehouse space. Building B will cover an area of approximately 599,654 square feet which will consist of 12,000 square feet of office space and 587,654 square feet of warehouse space. There are 12 loading docks proposed for Building A and 10 loading docks proposed for Building B. All loading docks are located on the east side of the buildings, facing southeasterly.
Contact Information
Name
Gina M. Gibson
Agency Name
City of Rialto
Contact Types
Lead/Public Agency
Phone
Location
Cities
Rialto
Counties
San Bernardino
Cross Streets
Riverside Avenue / Agua Mansa Road
Total Acres
76
State Highways
SR-60, I-10
Waterways
Santa Ana River
Base
SBB&M
Notice of Determination
Approving Agency
City of Rialto
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.