Document Description
The project involves dredging approximately 250 cubic yards of sediment for slope stabilization at the toe of the existing rock-armored shoreline slope between docks H and I. The project depth for the dredging portion is -8 feet Mean Lower Low Water (MLLW). The dredged material will be removed from the landside by crane or drag line and either reused for construction fill onsite or disposed of at a permitted landfill or at another upland location approved by the Water Board.
Contact Information
Name
Elizabeth Christian
Agency Name
Regional Water Quality Control Board, Region 2 (San Francisco Ba
Contact Types
Lead/Public Agency
Phone
Location
Cities
Berkeley
Counties
Alameda
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Section 15304
Reasons for Exemption
Project consists of maintenance dredging where the dredged material is deposited in a disposal area authorized by all applicable state and federal agencies, as described in Section 15304(g).