Town Center PD Zoning Regulations

3 Documents in Project

Summary

SCH Number
2005061063
Lead Agency
City of Yorba Linda
Document Title
Town Center PD Zoning Regulations
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2005
Present Land Use
Designated Community Core in the General Plan, various residential, commercial, and institutional zones
Document Description
The Yorba Linda Town Center PD Zoning Regulations project is to establish development standards & design guidelines and to list a range of appropriate land uses intended to implement the Yorba Linda Town Center Master Plan. In adopting the proposed PD zoning regulations, the current land use and zoning designations would be replaced by the PD Zoning Regulations. In addition, the project would involve conceptual plan approval of a pedestrian bridge across Imperial Highway within the Yorba Linda Town Center Master Plan area, as well as relocation of the existing Orange County Fire Authority Station No. 10 from its present location on Lemon Drive to a 2.39-acre parcel. Finally, the project includes a Capacity Analysis review and analysis for peripheral land uses to ensure the availability of adequate infrastructure to accommodate future growth of up to 15 to 25 percent.

Contact Information

Name
Bruce M. Cook
Agency Name
City of Yorba Linda
Contact Types
Lead/Public Agency

Location

Cities
Yorba Linda
Counties
Orange
Cross Streets
Imperial Hwy. / Yorba Linda Boulevard
Zip
92886
Total Acres
130
State Highways
90

Notice of Determination

Approving Agency
Yorba Linda City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print