Water Diversion from Fern Creek per Appropriative Water Rights Application Number 28609
3 Documents in Project
Summary
SCH Number
2005052032
Lead Agency
June Lake Public Utility District
Document Title
Water Diversion from Fern Creek per Appropriative Water Rights Application Number 28609
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2005
Document Description
The proposed project involves an appropriative water rights application currently pending before the State Water Resources Control Board (SWRCB), Division of Water Rights. The application proposes diversions for municipal and domestic purposes by the June Lake Public Utility District (JLPUD) from Fern Creek tributary to Reversed Creek thence Rush Creek thence Mono Lake in Mono County, California. The total rate of diversion is 0.3 cubic foot per second (134.65 GPM).
The existing diversion facility consists of a sluice intake with a 4-foot diameter gated corrugated metal pipe (CMP) and a 5-foot diameter gated CMP overflow; a diversion building whereby water is diverted by gravity flow through a 6-inch ductile iron pipeline; a staff gauge located at the 4-foot outlet weir; and a Stevens Flow Meter. The project would involve no new construction of facilities; the diversion would be accomplished entirely through the existing facilities. NOTE: A condition place upon this water source by two previous licenses (#10837 and #10838) shall remain in effect for the subject application. This condition reads "The District shall install and maintain a permanent piped bypass around Fern Creek source sized such that a minimum of 200 gallons per minute will always flow by the diversion regardless of water use by the District, and configured such that it can't be restricted or plugged." As a further point of information, this bypass has been constructed and maintained, as per the terms of the original condition.
Contact Information
Name
Mindy Pohlman
Agency Name
June Lake Public Utility District
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Mono
Cross Streets
Hwy. 158 / Iowa Street
Zip
93529
Total Acres
< 1
State Highways
158
Waterways
Fern Creek
Township
2S
Range
26E
Section
21
Base
MDBM
Other Location Info
June Lake
Notice of Determination
Approving Agency
June Lake Public Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.