Home Depot Retail Center Specific Plan

3 Documents in Project

Summary

SCH Number
2005051047
Lead Agency
City of Yucca Valley
Document Title
Home Depot Retail Center Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2006
Present Land Use
Existing land use: Open Space Zoning: General Commercial (G-C) and Specific Plan (SP)
Document Description
Project involves development of a retail shopping center including a home improvement center (Home Depot), restaurant or bank, and other retail uses on approximately 18 acres, and includes off-site roadway and infrastructure improvements. The Home Depot store and garden center will be approximately 137,283 square feet (SF) on 13.09 acres. The rest of the project site will be divided as follows: three retail buildings totaling 34,610 SF on 5.21 acres; and a 3,000 SF restaurant or bank on 0.90 acre. Entitlements sought include: (1) a Specific Plan to establish the site planning concept, design and development guidelines, in addition to the administrative procedures needed to achieve an orderly and compatible development of the plan area; (2) a Conditional Use Permit for certain uses are allowed in the commercial designation, but which are subject to condition; and (3) a Parcel Map to subdivide the property into four parcels associated with the location of proposed building pads.

Contact Information

Name
Shane Stueckle
Agency Name
City of Yucca Valley
Contact Types
Lead/Public Agency

Location

Cities
Yucca Valley
Counties
San Bernardino
Cross Streets
Avalon and Highway 62
Zip
92284
Total Acres
18.36
Parcel #
0601-201-37-0000
State Highways
SR-62, SR-247
Airports
Yucca Valley Airport
Schools
High School, Jr. High
Waterways
Covington Wash
Township
1N
Range
6E
Section
32

Notice of Determination

Approving Agency
Town of Yucca Valley
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print