EID Relocation of Water Rights
3 Documents in Project
Summary
SCH Number
2005042129
Lead Agency
El Dorado Irrigation District
Document Title
EID Relocation of Water Rights
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2005
Present Land Use
Various
Document Description
The project involves changing four existing water rights to add new places and purpose of use and new points of diversion or re-diversion. Included are: water right license No. 2184 for Weber Reservoir and three pre-1914 appropriative rights on Weber Creek (Farmer's Free Ditch), Slab Creek (Summerfield Ditch), and Hangtown Creek (Gold Hill Ditch). EID would keep diversions closed on the creeks to allow natural flows and released stored water from Weber Reservoir to continue downstream to Folsom Reservoir. The project would add the El Dorado Hills Raw Water Pump Station at Folsom Reservoir as an authorized point of re-diversion; add areas served or to be served by EID in El Dorado Hills and Cameron Park as authorized places of use; add fish, wildlife, and recreation uses within Weber Creek as authorized purposes of use; add municipal, industrial, and fire protection as authorized purposes of use; and add the El Dorado Hills / Cameron Park areas as authorized places of use. Operational improvements include managing Weber Reservoir as agreed with the State of California and the California Department of Fish and Game to maintain a minimum storage at Weber Reservoir and providing minimum releases to Weber Creek to protect and enhance fish and wildlife conditions. No physical changes to the environment are proposed. Only minor operational changes to EID's existing system would be necessary.
Contact Information
Name
W. Chris Word
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Placerville
Counties
El Dorado
State Highways
50
Waterways
Slab Creek, Weber Creek, S. Fork American, Folsom Lake
Township
10N
Range
8E
Section
10
Base
MDBM
Other Location Info
El Dorado Hills
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes