Bruce Road Stormwater Outflow
5 Documents in Project
Summary
SCH Number
2005042073
Lead Agency
City of Chico
Document Title
Bruce Road Stormwater Outflow
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2011
Present Land Use
R2-RM (Medium Density Residential - Resource Management overlay zone)
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2011-0052-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, M.B.D. Inc.
The project is limited excavation of a temporary ditch within the north bank on Little Chico Creek to allow for the installation of a stormwater outfall structure. The ditch will be constructed while the creek is dry or at very low flows to avoid work within the wetted area of the streambed. All work is proposed to be conducted within the road right-of-way to minimize disturbance of any riparian vegetation present in the area.
Contact Information
Name
Robert C. Hosea
Agency Name
DFG
Contact Types
Lead/Public Agency
Phone
Location
Cities
Chico
Counties
Butte
Cross Streets
Bruce Road / Picoline Way (640' to the south)
Zip
95926
Total Acres
2.5
Parcel #
018-390-012
State Highways
99, 32
Schools
Marsh Creek Jr., Little Chico ES
Waterways
Little Chico Creek
Township
22N
Range
2E
Section
29
Base
Diablo
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes