Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Badlands Sanitary Landfill in Riverside County, SWIS No. 33-AA-0006
6 Documents in Project
Summary
SCH Number
2005041040
Lead Agency
Riverside County
Document Title
Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Badlands Sanitary Landfill in Riverside County, SWIS No. 33-AA-0006
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2016
Present Land Use
Land Use: Existing landfill. Zoning: W-2 (Controlled Development). General Plan: Public Facility and Disposal Site.
Document Description
Proposed changes include: Revise the hours for the receipt of waste from 4:00 a.m. to 8:00 p.m. Monday-Sunday; Revise the permitted tonnage from 4,000 tons per day (tpd) for disposal to 4,500 tpd for disposal plus 300 tpd for beneficial reuse; Update total design capacity from 33,560,993 cubic yards to 34,400,000 cubic yards; Grading plan modifications including the construction of an engineered berm; Accept non-hazardous high moisture content wastes, non-hazardous asbestos containing waste, non-hazardous dewatered sewage and waste water treatment sludge, and non-hazardous sludge for disposal; Recirculate leachate, gas condensate and stormwater runoff in lined areas; and update the estimated closure date from 2024 to 2022.
Contact Information
Name
Megan Emslander
Agency Name
CalRecycle
Contact Types
Lead/Public Agency
Phone
Location
Cities
Moreno Valley
Counties
Riverside
Cross Streets
Theodore Street
Zip
92555
Total Acres
1,168.3
Parcel #
413-140-023, 024, 025, 030, portion of 028, 029; 422-000-011, 014, 015; 422-050-014
State Highways
60
Township
2-3S
Range
2W
Section
32,4,5
Base
SBB&M
Other Information
Section: 29
Notice of Determination
Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A