Elmira Road Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2005032108
Lead Agency
City of Vacaville
Document Title
Elmira Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2005
Present Land Use
Agriculture
Document Description
The City of Vacaville Public Works Dept. is proposing to replace the existing reinforced concrete slab and girder structure of Elmira Road over Old Alamo Creek with three 10 feet wide by 4 feet high box culverts. The roadway curb-to-curb width would increase from 27.5 feet to 40 feet. The new roadway width would accommodate two 12-foot travel lanes and two 8-foot bicycle lanes. This portion of Elmira Road is designated as a 2-lane arterial road by the City of Vacaville General Plan. The proposed action also includes constructing a concrete headwall, installing guardrails on the north and south sides of the headwall, and constructing a 100-foot transitional approach on the east and west sides of the structure. No right-of-way acquisition would be required for this proposed action.

Contact Information

Name
Erika S. Jackson
Agency Name
City of Vacaville
Contact Types
Lead/Public Agency

Location

Cities
Vacaville
Counties
Solano
Cross Streets
Elmira Road / Old Alamo Creek crossing
Zip
95687
Total Acres
0.3
Railways
SPRR
Airports
Nut Tree Airport
Schools
Elmira School
Waterways
Old Alamo Creek

Notice of Determination

Approving Agency
Vacaville City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes