z01-007/PD01-008/TM01-1380/Bell Woods

5 Documents in Project

Summary

SCH Number
2005032044
Lead Agency
El Dorado County
Document Title
z01-007/PD01-008/TM01-1380/Bell Woods
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2016
Present Land Use
Vacant (grassland and oak woodland) Z: Estate Residential 10-acre GP: Adopted Plan
Document Description
The project proponent requested a rezone of the 34.28-acre property from Estate Residential Ten-acre (RE-10) to Single-Family Residential-Planned Development (R1-PD); a development plans with 56 lots including 54 single-family lots ranging size 11,004 to 26,080 sq. ft. with 2 open space lots; and residential subdivision map proposing 56 lots (54 single family lots and 2 open space lots). Design waivers have been requested to allow: 1. All sidewalks on local streets to be reduced from 6 to 4 feet; proposed lengths of C and D Court to exceed 500 feet (in fact are approx. 600 feet and 750 feet respectively), and the proposed lengths of A and B Court will exceed 500 feet when the length of Nicole Drive is added. A phasing map consisting of two development phases is also included in the project.

Contact Information

Name
Steven D. Hust
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Covello Circle
Total Acres
34.28
Parcel #
108-010-07
State Highways
Hwy 50
Airports
Cameron Airpark
Township
9N
Range
9E
Section
5
Other Location Info
El Dorado Hills

Notice of Determination

Approving Agency
Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print