Capitol West Side Projects; Central Plant Renovation and West End Office Complex
4 Documents in Project
Summary
SCH Number
2005032038
Lead Agency
Department of General Services
(DGS)
Document Title
Capitol West Side Projects; Central Plant Renovation and West End Office Complex
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2006
Present Land Use
Mixture of Office, Industrial, Parks/openspace, Residential, Residential Mixed use, and Intensive Mixed Use.
Document Description
The proposed project consists of the renovation of the Central Heating and Cooling Plant consistent with Alternative 2a as described in the Capitol West Side Projects FEIR. The project generally includes, but is not limited to, renovation and expansion of the existing Central Plant building; conversion of the open-loop condenser-water system to a cooling-tower system; cessation of the discharge of heated condenser effluent to the Sacramento River; installation of 20,000 tons of cooling tower capacity, an approximately 6 million gallon thermal storage tank, and an approximately four megawatt cogeneration facility; installation of new and/or modified chillers, boilers, electrical infrastructure, controls, water supply, and related mechanical equipment; enhancement of the security system; and modifications to the existing Central Plant site. The project also involves the installation and/or modification of various below-grade, off-site infrastructure appurtenances that convey steam, chilled water, electrical service, etc., to facilities on the Plant's distribution network. The Central Plant will continue to be operated by the California Department of General Services, Real Estate Services Division.
Contact Information
Name
Robert A. Sleppy
Agency Name
Department of General Services
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
P Street, 7th Street
Zip
95814
Total Acres
~4 acres
Parcel #
Multiple
State Highways
Interstate 5
Railways
UPRR
Airports
None within 2 miles
Schools
Washington, William Land, Theodore Judah, & Jedediah Smith Elem.
Waterways
Sacramento River
Notice of Determination
Approving Agency
Department of General Services
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.