Campus Electrical Infrastructure Renewal Project Phase 2A/2B
2 Documents in Project
Summary
SCH Number
2005011043
Lead Agency
University of California, Santa Barbara
Document Title
Campus Electrical Infrastructure Renewal Project Phase 2A/2B
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2005
Present Land Use
Academic Uses
Document Description
Phase 2 of the Electrical Infrastructure Plan would continue the conversion of the University's electrical distribution system to 12.47/kV as started under Phase 1. Phase 2 consists of two parts, 2A and 2B. Phase 2A will complete two new distribution circuits called Research North and Central Academic that were partially installed as part of Phase 1. A third circuit called Research South will also be added. Phase 2B will continue the building conversion scheduled for an electrical line called the Central Academic feeder. The last distribution circuit called Housing/Auxilliary will be installed and all remaining buildings on Campus will be converted to the new system under this phase.
Contact Information
Name
Shari Hammond
Agency Name
University of California, Santa Barbara
Contact Types
Lead/Public Agency
Phone
Location
Cities
Goleta, Santa Barbara
Counties
Santa Barbara
Cross Streets
Main Campus
State Highways
217
Airports
Santa Barbara
Waterways
Campus Lagoon
Notice of Determination
Approving Agency
University of California, Santa Barbara
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.