Alvarez Pump Station Pipeline Upsizing and Alvarez Pump Station Expansion (Project No. D1203 & D1204)

2 Documents in Project

Summary

SCH Number
2004121116
Lead Agency
Rancho California Water District
Document Title
Alvarez Pump Station Pipeline Upsizing and Alvarez Pump Station Expansion (Project No. D1203 & D1204)
Document Type
NOD - Notice of Determination
Received
Posted
2/18/2005
Present Land Use
Z: None GP: MDR / OS-C
Document Description
The proposed project consists of the construction and operation of approximately 4,980 lineal feet of a 24-inch diameter potable water transmission main and appurtenances. The proposed project will also include the construction and operation of an additional 125 horsepower vertical turbine pumping unit and associated piping for the existing Alvarez Pump Station. Included with the Alvarez Pump Station Expansion project will be the replacement of the existing electrical motor control panel. Alzarez Pump Station is located on one parcel totaling 0.24 acres, owned by Rancho California Water District. The pump station site lies in unincorporated Riverside County, fronting State Hwy. 79 South approximately 1,400 feet west of the intersection of Anza Road and State Hwy. 79 South. The transmission main will be located within State Hwy. 79 South from the Alvarez Pump Station site to Anza Road and within Anza Road from State Hwy. 79 South to Monte Verde Road.

Contact Information

Name
Andrew L. Webster
Agency Name
Rancho California Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
SR 79S / Anza Road
Zip
92592
Total Acres
~ 3.5
Parcel #
N/A
State Highways
79S
Railways
None
Airports
None
Schools
None
Waterways
Temecula Creek
Township
8S
Range
2W
Section
11, 14
Base
SBM
Other Location Info
Rancho California

Notice of Determination

Approving Agency
Rancho California Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print