Monterey Peninsula Water Management District

12 Documents in Project

Summary

SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Monterey Peninsula Water Management District
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2012
Present Land Use
Open Space on the Former Fort Ord Low-Density Residential
Document Description
ASR entails diversion of treated excess flow, as defined by resource agencies, from the Carmel River Basin in wet periods for injection into the Seaside Groundwater Basin for later extraction in dry periods. The primary objective is to help reduce dry season diversions from the lower Carmel River, which adversely affect sensitive species and habitat. The proposed project includes conversion of a full-scale test well to a permanent, operational well (the 3rd ASR Well, or ASR-3), plus construction, testing and operation of a new ASR well (the 4th ASR Well, or ASR-4), a backflush pit, and an electrical building at the Seaside Middle School site.

Contact Information

Name
Herietta Stern
Agency Name
Monterey Peninsula Water Management District
Contact Types
Lead/Public Agency

Location

Cities
Carmel, Monterey, Seaside, Monterey, Seaside
Counties
Monterey
Cross Streets
General Jim Moore Boulevard and Eucalyptus Road
Zip
93940
Total Acres
10
Parcel #
N/A
State Highways
1,68,218
Railways
N/A
Airports
Monterey Penninsula
Schools
Fitch Middle School
Waterways
Pacific Ocean
Township
N/A
Range
N/A
Section
N/A
Base
Long. 36
Other Location Info
Former Fort Ord
Other Information
Base: Long. 36° 35' 00" and Lat. 121° 50' 00"

Notice of Determination

Approving Agency
Monterey Peninsula Water Management District Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes