Monterey Peninsula Water Management District
12 Documents in Project
Summary
SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Monterey Peninsula Water Management District
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2011
Present Land Use
Open Space on the Former Fort Ord
Low-Density Residential
Document Description
The proposed Aquifer Storage and Recovery project involves the construction of a new well adjacent to the existing Santa Margarita test well (both located on Former Fort Ord) that would be used to inject water diverted from the Carmel River into the aquifer during times of high flows (December to March). This water would later be extracted for use during the dry season. The timing, not the total amount of water diverted from the Carmel River, would be changed by implementing the project.
Contact Information
Name
Jan Sweigert
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carmel, Monterey, Seaside, Monterey, Seaside
Counties
Monterey
Cross Streets
General Jim Moore Boulevard and Eucalyptus Road
Zip
93940
Total Acres
10
Parcel #
N/A
State Highways
1,68,218
Railways
N/A
Airports
Monterey Penninsula
Schools
Fitch Middle School
Waterways
Pacific Ocean
Township
N/A
Range
N/A
Section
N/A
Base
Long. 36
Other Location Info
Former Fort Ord
Other Information
Base: Long. 36° 35' 00" and Lat. 121° 50' 00"
Notice of Determination
Approving Agency
California Department of Public Health
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.