Water Treatment Facility Modification
12 Documents in Project
Summary
SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Water Treatment Facility Modification
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2019
Document Description
The proposed modification consists of the construction of a new water treatment building (commonly referred to as "water treatment facility" in this document) and above-grade treatment works, as well as related water treatment piping. In addition, the project also entails the construction of a truck off-loading rack adjacent to the proposed water treatment facility. The building would be approximately 1,700 square feet. The maximum building height of the treatment facility would be approximately 19 feet above finish grade. The building would be designed to be visually compatible with existing structures located on-site. The proposed water treatment facility would increase treatment capacity to accommodate production from existing facilities located at the Seaside Middle School site, as well as other future ASR facilities. The proposed treatment facility would increase the overall treatment capacity to approximately 12.9 MGD or 9,000 gpm.
Contact Information
Name
Maureen Hamilton
Agency Name
Monterey Peninsula Water Mgt. Dist.
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Monterey
Other Location Info
The proposed project is located in the City of Seaside, southeast of the intersection of General Jim Moore Boulevard and Eucalyptus Road, in an area known as the Santa Margarita Site.
Notice of Determination
Approving Agency
Monterey Peninsula Water Management District Board of Directors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes