Backflush Basin Expansion
12 Documents in Project
Summary
SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Backflush Basin Expansion
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2018
Present Land Use
Open Space on the Former Fort Ord
Low-Density Residential
Document Description
PRoject involves the expansion of the existing backflush basin to accommodate the increased backflush water from the existing ASR facility at Seaside Middle School and a planned ASR facility at Fitch Park. Other than providing additional capacity, the expansion of the backflush basin would not change operations of the ASR project. New and revised facilities are identified below based upon details from MPWMD and the basis of design information:
Grading and contouring to facilitate construction and improve access;
Second driveway on General Jim Moore Blvd to facilitate Operations and Maintenance activities during construction and major maintenance activities;
Backflush basin expansion, as noted above;
New frontage fence; and
Two new sound walls, not currently proposed, included in anticipation of future works.
Contact Information
Name
Maureen Hamilton
Agency Name
Monterey Peninsula Water Mgt. Dist.
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Carmel, Monterey, Seaside, Monterey, Seaside
Counties
Monterey
Cross Streets
General Jim Moore Boulevard and Eucalyptus Road
Zip
93940
Total Acres
10
Parcel #
N/A
State Highways
1,68,218
Railways
N/A
Airports
Monterey Penninsula
Schools
Fitch Middle School
Waterways
Pacific Ocean
Township
N/A
Range
N/A
Section
N/A
Base
Long. 36
Other Location Info
Former Fort Ord
Other Information
Base: Long. 36° 35' 00" and Lat. 121° 50' 00"
Notice of Determination
Approving Agency
Monterey Peninsula Water Mgt. Dist.
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.