Aquifer Storage and Recovery (ASR) Project and Pure Water Monterey Groundwater Replenishment (PWM/GWR) Project Changes Related to Approval of an Addendum for a

12 Documents in Project

Summary

SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Aquifer Storage and Recovery (ASR) Project and Pure Water Monterey Groundwater Replenishment (PWM/GWR) Project Changes Related to Approval of an Addendum for a
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2017
Present Land Use
Open Space on the Former Fort Ord Low-Density Residential
Document Description
The proposed Monterey Pipeline would convey water from an existing pipeline at the intersection of Yosemite Street and HIlby Avenue (its eastern terminus) through Seaside and Monterey to the Eardley pump station within the City of Pacific Grove (the western terminus). The entire Monterey Pipeline would be 6.5 miles long. This Addendum addresses the proposed re-alignment of an approx. 0.44 mile (2,350 linear feet) segment of the Monterey Pipeline. The previously analyzed route of this segment of the Monterey Pipeline was proposed within the existing right of way of Lily Street and Hoffman Ave. The revised alignment begins at the intersection of Lily Street and Irving Ave., where the proposed route woudl turn north onto Irving, then east onto Spencer Street. The revised alignment would end at intersection of Spencer and Hoffman, where it would continue following the current approved alignment.

Contact Information

Name
Maureen Hamilton
Agency Name
Monterey Peninsula Water Mgt. Dist.
Contact Types
Lead/Public Agency

Location

Cities
Carmel, Monterey, Seaside, Monterey, Seaside
Counties
Monterey
Cross Streets
General Jim Moore Boulevard and Eucalyptus Road
Zip
93940
Total Acres
10
Parcel #
N/A
State Highways
1,68,218
Railways
N/A
Airports
Monterey Penninsula
Schools
Fitch Middle School
Waterways
Pacific Ocean
Township
N/A
Range
N/A
Section
N/A
Base
Long. 36
Other Location Info
Former Fort Ord
Other Information
Base: Long. 36° 35' 00" and Lat. 121° 50' 00"

Notice of Determination

Approving Agency
Monterey Peninsula Water Mgt. Dist.
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print