Lewis Logging Conditional Use Permit CUP-04-10

2 Documents in Project

Summary

SCH Number
2004112028
Lead Agency
Humboldt County
Document Title
Lewis Logging Conditional Use Permit CUP-04-10
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2005
Present Land Use
Former industrial site, vacant. Z: Heavy Industrial GP: Industrial General
Document Description
The applicant proposes the development of a maintenance yard and office for an existing logging company. A Conditional Use Permit is required for the development of a caretaker's residence on the property. The two proposed uses will be served by one new on-site sewage disposal system. The 11.5-acre parcel is currently home to several pieces of industrial equipment that will either be removed or used as a part of the logging operation. All development will occur more than 50' from the intermittent creek that follows the parcel's westerly property line. Residence and office/maintenance building will be served by an on-site well. A small clump of conifers will be removed as well.

Contact Information

Name
Michael E. Wheeler
Agency Name
Humboldt County Planning Division
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Hwy 101 / Sorenson Road
Zip
95540
Total Acres
11.5
Parcel #
209-411-04
State Highways
US 101
Railways
NWPRR (inactive)
Waterways
Eel River
Township
1S
Range
2E
Section
9
Base
HM
Other Location Info
Redcrest

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print