ER 96-28 Ryan Park - Zone Change and Conceptual Master Plan for Community Park - Addendum
Summary
SCH Number
2004109073
Lead Agency
City of Escondido
Document Title
ER 96-28 Ryan Park - Zone Change and Conceptual Master Plan for Community Park - Addendum
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2004
Document Description
Zone Change from RA-5 (Residential Agriculture - 5 acre minimum) to OS (Open Space) in conjunction with a conceptual master plan for a 67.4 acre community park site that includes a five acre high school campus on the western portion of the site. Project level environmental review for the school site will be completed in the future when a preliminary plan is developed for that portion of the site. Potential park uses include two concession/restroom buildings, six soccer fields, five baseball fields, three football/multi-use fields, a playground/tot lot, two basketball courts, a maintenance building, a perimeter multi-use trail for pedestrians and cyclists, open space, and approximately 670 parking spaces. The project also includes outdoor lighting for the basketball courts, parking lots, and athletic fields. Proposed street improvements include the widening of Valley Center Road along the site frontage to the ultimate width of 116 feet, and the construction of a 46-foot wide curb-to-curb extension of East Washington Avenue through the project site to provide access to the parking areas and future residential property to the south.
Contact Information
Name
Barbara Redlitz
Agency Name
City of Escondido, Planning Division
Contact Types
Lead/Public Agency
Phone
Location
Cities
Escondido
Counties
San Diego
Notice of Determination
Approving Agency
City of Escondido
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.