Zone 40 Central Surface and Groundwater Treatment Plant, Pipelines and Corporation Yard

3 Documents in Project

Summary

SCH Number
2004092050
Lead Agency
Sacramento County
Document Title
Zone 40 Central Surface and Groundwater Treatment Plant, Pipelines and Corporation Yard
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2011
Present Land Use
Water Treatment Plant, AG-80, General Agriculture
Document Description
The proposed project will provide up to 93 million gallons a day of potable water to existing and approved urban development within the SCWA Zone 40 area. An associated SCWA corporation yard to house facilities and store equipment will be co-located on the site along with a groundwater treatment facility. Raw surface water will be provided to the treatment facility from an intake along the Sacramento River approximately 10 miles to the west. Raw groundwater will be provided to the treatment facility from the Excelsior/Florin Road well field. Treated water pipelines will be constructed on portions of Florin and Exelsior Roads. Subsequent phases will not be built until after 2029.

Contact Information

Name
Roxanne Cargill
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Florin and Excelsior Rds
Zip
95826
Parcel #
066-0060-001
State Highways
16
Railways
Central Calif, Traction
Airports
Mather
Waterways
Folsom South Canal, Gerber Creek, Elder Creek
Township
8N
Range
6E
Section
34

Notice of Determination

Approving Agency
CA Department of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print