Lower Reach river Supply Conduit - Unit 4 pipeline, Rowena Tank Branch Line and the Fletcher Pump Station Branch Line
10 Documents in Project
Summary
SCH Number
2004081151
Lead Agency
Los Angeles County
Document Title
Lower Reach river Supply Conduit - Unit 4 pipeline, Rowena Tank Branch Line and the Fletcher Pump Station Branch Line
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2011
Document Description
Unit 1B of the Lower Reach, River Supply Conduit project, funded under the Safe Drinking Water State Revolving Fund, will enable LADWP to comply with the Long Term 2 Enhanced Surface Water Treatment Rule and ensure conveyance of water through the construction of approximately 5,300 linear feet of 96-inch diameter welded steel potable water pipeline and appurtenant structures.
Contact Information
Name
Sarah Easley Perez
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency
Phone
Location
Cities
Burbank, Los Angeles
Counties
Los Angeles
Cross Streets
Forest Lawn / Greenwood to Armstrong / West Silver Lake
Zip
90068, 027
State Highways
SR-134, SR-2, I-5
Railways
Metrolink (Glendale)
Airports
Bob Hope Airport ( > 2 miles)
Schools
Providence HS and Ivanhoe ES
Waterways
Los Angeles River, Rowena, Ivanhoe, and Silver Lake Reservoirs
Other Location Info
Griffith Park / Los Feliz / Silver Lake
Notice of Determination
Approving Agency
CDPH
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.