Opportunity Study Site #1 - Site Development Permit 3-16-4889

55 Documents in Project

Summary

SCH Number
2004071039
Lead Agency
City of Lake Forest
Document Title
Opportunity Study Site #1 - Site Development Permit 3-16-4889
Document Type
NOD - Notice of Determination
Received
Posted
7/11/2016
Present Land Use
Baker Ranch Planned Community - Residential / Mixed Use
Document Description
Site Development Permit 3-16-4889 is a request to develop Planning Area 1G of the Shea/Baker Ranch Area Plan (Area Plan 2-11-1732) with 60 single-family residences. The requested Site Development Permit provides for the construction of two-story single-family homes (one per lot) with attached two-car garages on 60 lots; and associated improvements, including driveway paving, parkway landscaping and wall/fences. All lots are previously approved and rough graded per Tentative Tract Map 16466. The project includes three floor plans, three different architectures styles and twelve color schemes. Each unit will include a two-car garage and a two-car driveway. 68 on-street parking spaces are available.

Contact Information

Name
Amanda Lauffer
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency

Location

Cities
Lake Forest
Counties
Orange
Cross Streets
Bake Parkway / Dimension (future)
Zip
92630
Total Acres
386.8
Parcel #
610-421-17 thru 09; 610-422-01; 610-431-01 thru 12; 410-432-01 thru 17; 612-132-01, 612-134-05
State Highways
Hwy 241
Railways
No
Airports
No
Schools
Foothill ES
Waterways
Borrego Canyon Wash
Township
6S
Range
8W
Section
1,2,11
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print