Piru Wastewater Treatment Plant (WWTP) Upgrade; Small Community Wastewater Grant No. 922; State Revolving Fund Loan No. C-06-4946-110

5 Documents in Project

Summary

SCH Number
2004071028
Lead Agency
Ventura County
Document Title
Piru Wastewater Treatment Plant (WWTP) Upgrade; Small Community Wastewater Grant No. 922; State Revolving Fund Loan No. C-06-4946-110
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2007
Present Land Use
Agricultural Exclusive Z: Agricultural Exclusive
Document Description
The proposed project will include constructing and installing (1) a flow meter, (2) an influent pump station, (3) an equalization tank, (4) a pump station, (5) two preliminary rotary drum screens, (6) a membrane bioreactor system, (7) a chemical feed system, (8) a utility water system, (9) a solids handling facility, (10) a control and maintenance building, (11) an emergency power generator, and (12) an instrumentation and control system. In addition, the project involves demolishing and reconstructing the Western Block Wall to expand the existing WWTP.

Contact Information

Name
Kari Schumaker
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Fillmore
Counties
Ventura
Cross Streets
Hwy 126, W of Piru, bound on the west by Hopper Canyon, on the north and northwest by railroad
Total Acres
1.23
Parcel #
055-0-170-375
State Highways
126
Railways
Short Line Enterprises
Waterways
Hopper Creek
Other Location Info
2815 E. Telegraph Road, Piru, CA 93040
Other Information
Cross Streets: tracks, on the south by Hwy 126, and on the east by an unpaved agricultural road.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes