Friends Christian High School Parcel Map, Conditional Use Permit, Design Review
4 Documents in Project
Summary
SCH Number
2004011114
Lead Agency
City of Yorba Linda
Document Title
Friends Christian High School Parcel Map, Conditional Use Permit, Design Review
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2005
Present Land Use
Vacant / Residential Estate with Oil Production combining Overlay Zone / Medium Low Density Residential
Document Description
The proposed project consists of a Parcel Map (TPM 2004-203), Conditional Use Permit (CUP 2003-77), and Design Review (DR 2003-23) to allow for the development of a new private high school that will serve approximately 1,200 students (grade 9-12) within approximately 45 classrooms. A total of 175,000 square feet of building space within eight buildings is being proposed. The project also includes an athletic field for football, track and field, soccer, baseball field, softball field, tennis courts, hardcourts, gymnasium, pool, and an approximate 0.25 acre detention basin. A total of 522 parking spaces within two parking lots and 93 overflow parking spaces are being proposed.
Contact Information
Name
David Brantley
Agency Name
City of Yorba Linda
Contact Types
Lead/Public Agency
Phone
Location
Cities
Yorba Linda
Counties
Orange
Cross Streets
Bastanchury Road and Casa Loma Avenue
Zip
92686
Total Acres
32
State Highways
90-Imperial Highway
Waterways
Carbon Canyon Dam
Township
3S
Range
9W
Section
29
Base
YrbaLnda
Notice of Determination
Approving Agency
City of Yorba Linda
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.