Estate (0.5-3 dwelling units per acre), low-density residential (3.1-5 dwelling units per acre), two elementary school sites, two public park sites, a small manufactured home park, and an area of greenbelt buffer within an overlying density transfer zone.
Document Description
The project is limited to placing ~5,612 cubic yards of soil material within ~2,350 linear feet of the Brazelton Drain. The limits of the fill area will be from Vanden Road (upstream) to the existing culvert crossing at Leisure Town Road (downstream). A temporary rock check dam will be constructed at the culvert crossing for sediment control. The CA Dept. of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2012-333-3 pursuant to Section 1602 of the Fish and Game Code to the Project Applicant, Nor Cal CO LP/Carl Zocchi.
Contact Information
Name
Karen Weiss
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Vacaville
Counties
Solano
Cross Streets
Vanden Road / Alamo Drive
Zip
95687
Total Acres
287
Parcel #
0136-120-020 and -080, 0136-110-040, -050, -060, and -080
State Highways
I-80
Railways
Union Pacific
Airports
Travis AFB
Schools
Vacaville, Travis Districts
Waterways
Alamo Creek, SID Canals
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.