Kern 46 Conventional Highway Segment 4a Project (Streambed Alteration Agreement No. 1600-2016-0001-R4)

11 Documents in Project

Summary

SCH Number
2003041036
Lead Agency
California Department of Transportation, District 6
Document Title
Kern 46 Conventional Highway Segment 4a Project (Streambed Alteration Agreement No. 1600-2016-0001-R4)
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2017
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2016-0191-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Caltrans. In general, the Project involves widening SR 46 over both the Main Flood Canal and Westside Canal. More specifically, the Project involves: installing a new Lost Hills Utility District water line beneath the Westside Canal; removing three Chevron pipelines which span both the Main Flood Canal and Westside Canal; constructing a new bridge over the Main Flood Canal; extending the double box culvert which supports the roadway over the West Side Canal; and demolition and replacement of the existing bridge over the Main Flood Canal.

Contact Information

Name
Steve Hulbert
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Kern, San Luis Obispo
State Highways
41, 33
Schools
Lost Hills Union School District
Waterways
CA Aqueduct
Other Location Info
City: Lost Hills

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print