Sump 28 Outfall Stabilization Project (CIP# WL06)
3 Documents in Project
Summary
SCH Number
2003022106
Lead Agency
City of Sacramento
Document Title
Sump 28 Outfall Stabilization Project (CIP# WL06)
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2005
Present Land Use
Transportation/Utilities
Outfall structures is located within the highwater mark of the Sacramento River and is considered Parks Open Space
Document Description
The proposed project consists of construction activities to stabilize the shoreline and stop erosion from undermining the Sump 28 outfall structures. Specific activities include constructing 12-inch thick concrete cut-off walls along the sides and back of the existing concrete apron. The concrete walls will be 3-feet deep and doweled into the apron and all voids under the apron shall be filled with crushed rock. Cal-Trans #2 backing will then be placed along with filter fabric along the top and both sides of the cut-off walls. For the smaller diameter outfall, a concrete saddle will be constructed for the pipes to rest on, with straps tied around the pipes, securing them to the saddle. The saddle will be 6-feet deep and 1-foot thick. #2 backing will then be placed around the saddle, on the sides of the pipes, and between the pipes up to the springline.
Contact Information
Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
Freeport Boulevard/Interstate 5
Total Acres
0.06+/-
Parcel #
031-0200-013,-014
State Highways
I-5
Railways
CA State Parks
Waterways
Sacramento River
Notice of Determination
Approving Agency
City of Sacramento Utilities Director
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A