Document Title
Tenth Avenue Marine Terminal Deepening Berths 10-3 to 10-6
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2005
Present Land Use
Port Master Plan Planning District 4 - Marine Terminal Land Use
Document Description
The Port District proposes to dredge approximately 30,000 cubic yards of sediment from the Tenth Avenue Marine Terminal Berths 10-3 to 10-6. Existing depths range from -34 feet to -42 feet Mean Lower Low Water. The proposed project includes deepening an approximately 50-foot wide area along the west face of the Terminal to a depth of about -43 feet MLLW, with a one-foot over-dredge. The project is necessary to provide a uniform depth along the seawall and permit more efficient utilization of the vessels currently calling at the Terminal. The dredged material will be taken by barge to the LA-5 ocean disposal site.

Contact Information

Name
John Helmer
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Crosby Street/Harbor Drive
State Highways
I-5
Railways
AT&SF
Airports
Lindbergh Field
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes