Ramona B Street Express Car Wash, S01-083

Summary

SCH Number
2002129002
Lead Agency
San Diego County
Document Title
Ramona B Street Express Car Wash, S01-083
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2002
Document Description
The proposal is a Site Plan application by Steve Powell to construct a fully automated exterior ride-thru car wash with limited auto detailing. The facility will operate during the daytime and customers are proposed to stay in their vehicles during the enitre washing process. The project will utilize the entire 0.3 acre parcel, which is currently a vacant lot, surfaced with gravel. Grading proposed for the project implementation will involve approximately 450 cubic yards of fill and a ratio of 1.5:1 for minor slopes and 2:1 for major slopes. A car wash tunnel structure, 98-feet long and 20-feet wide, will be constructed on the southwest portion of the site near the property line, adjacent to an existing building. A 32-foot by 26-foot office/cashier building is proposed for construction adjacent to the car wash tunnel. A concrete masonry unit wall approximately 16-feet high will be constructed near the northern property lines. The site will be paved with Portland cement proposed for construction at the B Street property line. A retaining wall measuring 70-feet long second floor as a resident manager's apartment and the bottom floor will be used to store supplies and spare parts. Access to the car wash is proposed form B Street. The proposed project will require a maximum of two employees.

Contact Information

Name
Emery McCaffery
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego

Notice of Determination

Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print