General Lease - Public Agency Use

7 Documents in Project

Summary

SCH Number
2002122066
Lead Agency
Santa Cruz County
Document Title
General Lease - Public Agency Use
Document Type
NOD - Notice of Determination
Received
Posted
1/21/2014
Present Land Use
Agriculture and Residential/Agriculture (A), Commercial Agriculture (CA), Urban low Residential (R-UM)
Document Description
The project is limited to trench excavation in beach sands to create a low trench flow outlet path from the terminus of the Pajaro River Lagoon to the Pacific Ocean. The dimensions of the excavated trench prior to breaching of the lagoon will be 10 feet wide, 3 feet deep and between 250 and 1,000 linear feet long. After the lagoon breaches, trench dimensions are expected to increase between 50 to 100 feet wide and decrease to between 1 to 2 feet deep. Trench length is not expected to change. Project activity shall take place after October 15 and before April 15. The CA Dept. of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0232-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Bruce LaClergue, Santa Cruz County Flood Control and Water Conservation District, County of Santa Cruz Department of Public Works.

Contact Information

Name
Martha Aja
Agency Name
City of Dublin
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
South of West Beach Road, and Shell Road
Parcel #
052-231-18
State Highways
1
Waterways
Monterey Bay, Watsonville Slough, McCluskey Slough

Notice of Determination

Approving Agency
City of Dublin
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print