Downtown Parking Improvement Program
4 Documents in Project
Summary
SCH Number
2002121122
Lead Agency
City of Santa Monica
Document Title
Downtown Parking Improvement Program
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2006
Present Land Use
General Plan: Downtown Core, General Commercial with Downtown Core, General Commercial
The area includes most of the Bayside District Specific Plan area and is also within the Downtown Urban Design Plan area.
Zoning: BSC (Bayside Commercial), C3C (Downtown Overlay)
The Local Coastal Program - Land Use Plan designates the area as downtown commercial use. The portion of the area west of 4th Street is located within the California Coastal Zone.
Document Description
The proposed project would involve: 1) seismic retrofitting of Parking Structure No. 2 at 1235 2nd Street and No. 4 at 1321 2nd Street; 2) demolition and reconstruction of Parking Structure No. 1 at 1234 4th Street, No. 3 at 1320 4th Street, and No. 6 at 1431 2nd Street; and 3) construction of two new structures, located generally in the area bounded by 4th Court and 6th Court between Wilshire Blvd. and Colorado Avenue. The Program would result in an increase of 1,712 parking spaces and up to approximately 59,340 square feet of ground floor commercial space.
Contact Information
Name
Ellen Gebhard
Agency Name
City of Santa Monica
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Monica
Counties
Los Angeles
Cross Streets
Bounded by Wilshire Blvd. on north, Colorado Ave. on south, 2nd St. on west, 6th Court on east
Zip
90401
State Highways
I-10, PCH, SR-1
Schools
Santa Monica HS
Notice of Determination
Approving Agency
City of Santa Monica
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.