Felsen Production Well Project
2 Documents in Project
Summary
SCH Number
2002121083
Lead Agency
Crestline Village Water District
Document Title
Felsen Production Well Project
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2003
Present Land Use
Single Family Residential
Public Water Facilities
Land Use Densities of the County of San Bernardino General Plan
San Bernardino County Development Code Section 84.0410 (r) exempts public water facilities form county zoning regulations.
Document Description
The proposed project consists of development and production of a vertical well using the existing well casing. A submersible pump with a 7.5 (+/-) horsepower submersible electric motor, power cable, and discharge piping will be installed within the well casing. A small segment (approximately 250 linear feet) of pipe is needed to connect the well to the existing water main and a small protective structure will be built on top of the approximately 25 square foot reinforced concrete slab surrounding the well casing in the center of the graded well pad.
Contact Information
Name
Norm Hunt
Agency Name
Crestline Village Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Cross Streets
Lake Gregory Drive and Felsen Drive
Zip
92325
Total Acres
25sq.ft
Parcel #
340-212-22
State Highways
18
Township
2N
Range
4W
Section
26
Base
SBBM
Notice of Determination
Approving Agency
Crestline Village Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.