Cross Valley Connector Gap Closure Project: Extension of Newhall Ranch Road from Copper Hill Drive/Rye Canyon Road to I-5
4 Documents in Project
Summary
SCH Number
2002121059
Lead Agency
City of Santa Clarita
Document Title
Cross Valley Connector Gap Closure Project: Extension of Newhall Ranch Road from Copper Hill Drive/Rye Canyon Road to I-5
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2006
Present Land Use
Open Space and Industrial / Residential Estate (RE), Business Park (BP), and Specific Planning (SP) / RE, BP, and SP
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0583-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Santa Clarita. City of Santa Clarita will alter the streambed by constructing the Cross Valley Connector Gap Closures (CVC-Gap Closure) project. The project will impact three drainages and an existing debris basin. Drainage A will be impacted by 0.20 acre; Drainage B will be impacted by 0.36 acre; Drainage C will be impacted by 3.07 acres. The project includes construction of an 8-lane divided arterial; outside curb and gutter; raised landscape median, a Class I Bike Lane on the south side; reinforced concrete pipe (RCP storm drains; concrete channel improvements; and the relocation of an earthen debris basin.
Contact Information
Name
Betty Courtney
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Copper Hill Drive / Rye Canyon / I-5 / SR-126
Total Acres
50
State Highways
I-5, SR-126
Schools
Valencia HS
Waterways
Santa Clara River
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.