Proposed Amendment of Land Use Permit (LP# 022026) for the Bulk Materials Processing Center at the West Contra Costa Sanitary Landfill ;
7 Documents in Project
Summary
SCH Number
2002102057
Lead Agency
Contra Costa County
Document Title
Proposed Amendment of Land Use Permit (LP# 022026) for the Bulk Materials Processing Center at the West Contra Costa Sanitary Landfill ;
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2004
Present Land Use
Industrial / M-1 / P-1
Document Description
The proposed project consists of construction of a new waste recycling and transfer station with office/employee break building; a new soil reclamation/processing operation with drying of biosolids and dredge materials, screening and blending of waste soils, and facility for blending of wet and powdery materials; a new Public Access Trail; relocation of and increase in asphalt/concrete recycling and construction of a new concrete recycling office building; relocation of and increase in composting and wood recovery activities; relocation of the existing equipment maintenance building; and expansion of operating hours, all located at the existing West Contra Costa Sanitary Landfill.
Contact Information
Name
Judith Battle
Agency Name
City of Richmond
Contact Types
Lead/Public Agency
Phone
Location
Cities
Richmond
Counties
Contra Costa
Cross Streets
Parr Blvd. & Richmond Pkwy.
Parcel #
408-140-013, 008-010
Notice of Determination
Approving Agency
City of Richmond
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.