Eugene BeDell

2 Documents in Project

Summary

SCH Number
2002092047
Lead Agency
Humboldt County
Document Title
Eugene BeDell
Document Type
NOD - Notice of Determination
Received
Posted
11/4/2002
Present Land Use
Single Family Residence with appurtenant structures. Preset Zoning: Agricultural General in addition to a Special Building Site combining zone specifying a minimum lot size of 10 acres and a Qualified combining zone (AG-B-5 (10)-Q).
Document Description
A minor subdivision of a 21.93 +/- acre parcel into parcel 1 of 11.86+/- acres and parcel 2 of 10.07 +/- acres. Proposed Parcel 1 is developed with a mobile home and shed (to remain). Parcel 2 is developed with a mobile home (to be dismantled; the parcel will be developed with a single family residence). The parcels are/will be served by on-site sewage disposal. Water for Parcel 1 will be provided by an existing well on Parcel 2 via an appropriate easement. Water for Parcel 2 will be provided by a proposed on-site well. PG&E will provide gas and electricity. The parcel has a Q combining zone to allow for the phased upgrade of Sawdust Trail Road to a road category 4 standard, therefore construction of the next phase of road inprovements will be a condition of the subdivision.

Contact Information

Name
Mary-Jane Ashburn
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Sawdust Trial Road/Tonopah
Zip
95519
Total Acres
21.93-/+
Parcel #
516-011-28
Township
6N
Range
1E
Section
NE1/41
Base
HM
Other Location Info
City: Fieldbrook

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print