Vineland II Water Tank
3 Documents in Project
Summary
SCH Number
2002091027
Lead Agency
Beaumont-Cherry Valley Water District
(BCVWD)
Document Title
Vineland II Water Tank
Document Type
NOD - Notice of Determination
Received
Posted
2/16/2003
Present Land Use
District Water Facilities & Tank/Vacant/Flood Control
RA (Residential Agricultural, 1 acre minimum)
Very Low Density Residential (0.4 - 2 du/ac)
Document Description
The Beaumont-Cherry Valley Water District is proposing to construct and operate potable and recycled water facilities in the Cherry Valley Area. Proposed facilities include two water storage tanks (one potable water, one recycled water), a booster/pressure reducing station and distribution pipelines. The new water storage tanks would be 104 feet in diameter and 34 feet in height. The water storage tanks and booster/pressure reducing station would be constructed on disturbed, vacant land. Proposed pipelines would be primarily routed through vacant land and along existing roads.
Contact Information
Name
Chuck Butcher
Agency Name
Beaumont-Cherry Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Beaumont
Counties
Riverside
Cross Streets
Vineland Street, Brookside Ave, Live Oak Avenue
Zip
92223
Total Acres
~4.2
Parcel #
403-070-016, 403200007
Schools
Chavez, Mountain View Junior High and Beaumont
Waterways
Noble Creek, Little San Gorgonio Creek
Township
2S
Range
1W
Section
27
Notice of Determination
Approving Agency
Beaumont-Cherry Valley Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.