Larissa Cham Major Residential Subdivision

3 Documents in Project

Summary

SCH Number
2002081067
Lead Agency
San Diego County
Document Title
Larissa Cham Major Residential Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
12/30/2005
Present Land Use
(5) Residential Z: (RV4) Variable Family Residential (385-200-02, 385-320-08), (RS4) Single-Family Residential (385-190-34)
Document Description
The project proposes a major subdivison of 4.65 net acres into 15 lots for single-family residential development. The lot sizes will range from 10,045 sq.ft. (net) to 12,570 sq.ft. (net). An existing residential duplex on Parcel 7 will be converted to a single-family dwelling and 14 additional dwelling units are proposed. The proposal will involve grading over 0.31 acre with a cut volume of 2,390 cubic yards and a fill volume of 3,360 cubic yards, of which 970 cubic yards will be imported. Access will be taken from a proposed private road off Winter Gardens Boulevard and a proposed dedicated public road off the private road easement. Other off-site improvements include the extension of utility lines including water, sewer, gas, and electric.

Contact Information

Name
Donna Beddow
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Sapota Drive
Total Acres
4.65
Parcel #
385-320-08, 385-200-02, 385-190-34
State Highways
Hwy. 67
Township
15S
Range
1W
Section
17
Base
SBM
Other Location Info
City: Lakeside 8658 Winter Gardens Boulevard

Notice of Determination

Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print