Hushbeck/Atri Stormwater Pump Station

3 Documents in Project

Summary

SCH Number
2002062073
Lead Agency
City of Watsonville
Document Title
Hushbeck/Atri Stormwater Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
8/5/2002
Present Land Use
Residential/Environmental Management
Document Description
The project consists of the construction of the new Hushbeck/Atri Storm Water Pump Station at Hushbeck Avenue and Atri Court replacing two old pump stations that do not have adequate capacity to prevent flooding during even moderate amounts of rainfall when Salsipuedes Creek is flowing at high levels. The new pump station will have two 40 cfs pumps. The old Atri Pump station had two 5,700 gpm pumps and the old Hushbeck Pump Station had one 4,000 gpm pump. The old Atri Pump Station will be converted into a storm drain box with a new 42-inch pipeline running along the outside of the creek levee connecting it to the new pump station. The old Hushbeck Pump station will be demolished. Two new outfalls will be constructed through the levee from the new pump station replacing the old outfalls. Also, a small building approximately 350 square feet will be built to house the electrical and control panels and a generator.

Contact Information

Name
Steve Palmisano
Agency Name
City of Watsonville
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Cross Streets
Hushbeck and Atri
Zip
95076
Total Acres
<1
State Highways
1
Railways
Union Pacific
Airports
Watsonville
Schools
Middle School
Waterways
Pajaro River;Salsipuedes Creek

Notice of Determination

Approving Agency
City of Watsonville
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No